5172
VARYLIFT lifting station Ø600 2 clear water/wastewater pumps in PE

This station is used for the collection of runoff (rainwater or infiltration water), grey water (waste water from wash basins, showers except for toilet water) and pre-treated water coming out of all-water pits, sewage treatment plants, or at the outlet of a sand filter.

Domestic lifting gear consisting of:
1 cylindrical tank Ø 630mm int. made of polyethylene (PE), min. usable volume 130L
1 tank bottom resistant to groundwater
1 screw-on PE cover resting on an O-ring
1 Forsheda gasket and a Ø100 bell saw for drilling the entrance to the site
1 cable entry Ø 63 ext.
1 outlet outlet made of pressure PVC with elbow and union Ø 40 mm
2 check valves PVC with F/F Ø 40 and 2 valves DN 32
2 pumps with 10 ml of cable, max. 35 mm solid body passage
(do not touch the pump float attached in the high position)
1 ventilation 
3 level switches
1 control panel CLIFT5182/01
This station is used for the collection of runoff (rainwater or infiltration water), grey water (wastewater from wash basins, showers except for toilet water) and pre-treated water coming out of all-water pits, sewage treatment plants or sand filters.
The tank receives all the water. It fills up, the low level regulator rises. When the water reaches the high level, pump n°1 is switched on (double low and high contact). When the low level is reached, the level controller gives the pump stop pulse. If the level continues to rise while a pump is running and reaches the highest level, the 2nd pump will also start.

N. B: inform users to prohibit wipes from being disposed of in the waste water network connected to the station.
Refer to the PRELPE manual before handling and fitting the lifting station.

For electrical connections, level controllers and pumps must be connected to the control box.
Periodically check that the pump orifice is not partially blocked. 
Clean the tank periodically. 
Clean the float switch monthly.

A maintenance contract of at least 2 visits per year with a specialized company must be signed as soon as the equipment is put into service.
The pump is guaranteed for 1 year from the date of invoice.
The warranty is subject to installation and maintenance conditions.

Options

  Description
RH502 -
RH6949 REHAUSSE COULISSANTE D640/D690